lkml.org 
[lkml]   [2013]   [Oct]   [10]   [last100]   RSS Feed
Views: [wrap][no wrap]   [headers]  [forward] 
 
Messages in this thread
/
Date
From
SubjectRe: [PATCH 1/2] regulator: s5m8767: Modify parse_dt function to parse data related to ramp
On Thu, Oct 10, 2013 at 05:51:00PM +0100, Mark Rutland wrote:
> On Thu, Oct 10, 2013 at 12:10:53PM +0100, Chanwoo Choi wrote:

> > Turn on ramp control of buck2/3/4.

> Ok, but why does this need to be in the dt?

Ramp control is a hardware system integration decision which people
working with regulators should be familiar with - you're trading off
speed of power on or voltage change for maximum current draw from the
regulator supply. The term should be sufficiently clear to an engineer
who can make an informed decision about using it.
[unhandled content-type:application/pgp-signature]
\
 
 \ /
  Last update: 2013-10-10 20:01    [W:0.101 / U:0.024 seconds]
©2003-2020 Jasper Spaans|hosted at Digital Ocean and TransIP|Read the blog|Advertise on this site